Thai Chau: Supplier Partner for the Hau Giang – Ca Mau Expressway

We, Thai Chau Import-Export Company Limited, are very proud to be chosen as the material supplier for the Hau Giang – Ca Mau expressway project. This is a key transportation project that plays a significant role in the infrastructure development of the Mekong Delta region.

The Hau Giang – Ca Mau project component starts at Km 53+000 and ends at Km 126+223, with a total expressway length of 73.223 km and an additional connecting route of 16.597 km. The total investment is over 17.152 trillion VND.

The expressway is designed with an investment phase featuring 4 lanes and a width of 17 meters; in its final phase, it will have 4 lanes with a width of 24.75 meters. The design speed is 100 km/h. Supporting facilities include a toll collection system without stops and an intelligent transportation system (ITS). (Source: Ca Mau Province Electronic Information Portal)

As of now, Thai Chau has provided a total of 2.4 million square meters of non-woven fabric, 1.3 million square meters of woven fabric, 10.5 million linear meters of vertical drainage wick, and 1.1 million linear meters of horizontal drainage board.

With our professional team, we are always ready to support and provide advice to quickly and effectively meet the project’s requirements. We consider the success of the Hau Giang – Ca Mau project as our own success and are committed to working alongside our partners to achieve the best results.

Thai Chau believes that close cooperation and reliability in supplying materials will help complete the project on time and achieve the highest quality. We look forward to continuing to partner and contribute to the development of other important infrastructure projects in the future.

 